High Strength Concrete Blanket for Channel, Slope Protection

Product Details
Customization: Available
After-sales Service: Online or Onsite Installtion Guide
Warranty: 5 Years
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Experienced Team
The supplier has 5 foreign trading staff(s) and 4 staff(s) with over 6 years of overseas trading experience
ODM Services
The supplier provides ODM services
to see all verified strength labels (17)
  • High Strength Concrete Blanket for Channel, Slope Protection
  • High Strength Concrete Blanket for Channel, Slope Protection
  • High Strength Concrete Blanket for Channel, Slope Protection
  • High Strength Concrete Blanket for Channel, Slope Protection
  • High Strength Concrete Blanket for Channel, Slope Protection
  • High Strength Concrete Blanket for Channel, Slope Protection
Find Similar Products
  • Overview
  • Product Description
  • Installation Instructions
  • Application
  • Company Profile
  • Packing & Delivery
  • FAQ
Overview

Basic Info.

Model NO.
Cement Blanket
Color
Grey
Application
Roads & Railways & Airports Project, Water Conservancy Project, Road Basement Slope Protection River Bank
Function
Reinforcement, Drainage, Slope Protection
Classification
Composite by Cement Mix and Fabric
Material
Concrete, PP & PE
Type
Composite by Cement Mix and Fabric
Length
Customized
Product Name
Cement Blanket
Project Solution Capability
Total Solution for Projects
Design Style
Industrial
After-Sale Service
Online Technical Support
Thickness
6-10mm
Transport Package
Normal Packing
Specification
5-20 M or Customized
Trademark
NUOLIAN
Origin
Shandong, China
HS Code
6815999000
Production Capacity
400000 Sqm / Year

Product Description

 
 
Product Description

High Strength Concrete Blanket for Channel, Slope ProtectionCement Blanket

Cement Blanket is a breakthrough material technology, which can use concrete on slopes, water and other hard-to-reach positions without form or mixing, and has lower equipment requirements.
The concrete blanket is a special engineering composite material with three- dimensional structure.
It is made of special cement, aggregate and other cementious materials and three-dimensional fabrics.
It can be widely used in water conservancy, railway, highway, environmental management, slope protection, structural slope protection and other fields.
The main functions are anti-seepage, lining emergency, etc.

Concrete erosion control mats are an effective solution for preventing erosion on slopes, embankments, and other areas with high water flow. Needle method cement mat is a mat material made of two layers of geotextile wrapped dry concrete mixture acupuncture, which provide strength and stability to the mat.

Mass of composite cement mat: 8kg/m2, 10kg/m2, 12kg/m2, 15kg/m2, etc.

Composite cement mat should be stored in a dry and ventilated warehouse. It is strictly prohibited to open the packaging before formal construction and laying.In the process of storage and transportation, attention must be paid to moisture, waterproof and leakage powder.


High Strength Concrete Blanket for Channel, Slope Protection
High Strength Concrete Blanket for Channel, Slope Protection
 
 
Density ASTM C 1185 1300~1600 kg/m³
Felxural strength ASTM C 1185 >15 Mpa
Compressive strength ASTM C109 >30 Mpa
Durable service life > 30 Years
Material Concrete, PP & PE
Thickness 5-15mm
Roll Width 1m, 2m or customized
Roll Length 5-20 m or customized
Weight 8-18kg/m2
Package Roll in bag
Original Dezhou, China

Concrete erosion control mats features:
• Concrete erosion control mats are highly durable and can withstand extreme weather conditions, such as heavy rain, high winds, and freezing temperatures.

• They are designed to be easy to install, with interlocking sections that can be quickly assembled on-site.

• The concrete erosion mats are resistant to UV rays and do not degrade over time, ensuring long-lasting protection against erosion.


Concrete erosion control mats applications:
• Slope protection: Concrete erosion control mats can be used on steep slopes to prevent erosion caused by rain or other water flow.

• Channel lining: They are also effective for lining channels and culverts to prevent erosion and protect the surrounding soil.

• Embankment stabilization: The concrete erosion mats from EcoGeoX can be used to stabilize embankments and prevent erosion caused by heavy traffic or water flow.

• Reservoir and dam protection: Concrete erosion control blankets are widely used for protecting reservoirs and dams from erosion caused by water flow and waves.

Concrete erosion control mats are a highly durable and effective solution for preventing erosion in a wide range of applications. They are easy to install and provide long-lasting protection against the elements.

 

Installation Instructions


1.  preparation work First, we must plan and measure to ensure a certain slope so that the water flow can flow smoothly from the upper end to the lower end. Secondly, after the construction site is cleaned and leveled, the construction line is set according to the design drawing, and the drainage slope is re-measured.

2. excavation Set the construction line according to the design requirements, the sides of the ditch need to be leveled, and the slope inside the ditch must not have any virtual soil and empty holes. It is necessary to treat the water damage parts in a tamping manner, except for debris and gravel in the slope. If necessary, use ash soil for compaction treatment, or grouting and reinforced to seal, and the treated parts are required to have good stability.

3. laying The material can be laid vertically and horizontally. Be sure to level the substrate, otherwise it will affect the appearance quality!

4. seam processing


4.1 The lateral width of the adjacent two cement blankets is 10cm wide and the depth is doubled. Place the cement blanket joint at the stack and flatten it.

4.2 Press the cement blanket above the cement blanket in the direction of the water flow, and the superimposed area shall not be less than 10cm.

4.3 Evenly apply sealant at the seam.

4.4 Fix two pieces of cement blanket with 5*38mm stainless steel screws

4.5 groove along the treatment Fix the edge of the material on the edge of the groove with rivets, and fix it with rivets, fix it and use it. The soil covers the edge.

4.6 watering solidification Before the watering, it is necessary to inspect and check the whole of the laying. After passing the water, it can be watered! It needs to be watered 9kg (thickness is calculated in 10mm) to be poured, and it must be poured less, evenly from the edge to the middle. Sprinkle water, preferably by spraying, the flow rate is 4000ml/min until the color of the cement blanket becomes darker. Do not use a water column with a high pressure! Do not step on the water after pouring water. When the temperature is ≤ 5 °C, take insulation measures. When the average temperature of day and night is higher than 30 °C, the surface should be covered with plastic film or geotextile,etc. Keep wet, watering and curing time should not be less than 3 days.
High Strength Concrete Blanket for Channel, Slope Protection
High Strength Concrete Blanket for Channel, Slope Protection
 
Application
 
High Strength Concrete Blanket for Channel, Slope Protection
Application
1. Ditch Lining
2. Slope protection. Building foundation pit protection.
3. Dam reinforcement.
4. Reservoir, pond.
5. Marine engineering tidal land.
Product advantage
1. Easy construction.
Completed in only 4 steps: Cutting, laying, lapping, hydrating. No need for large machinery. Available in rolls or in bulk easy for transportation, handling and installation.
2. Fireproof and UV resistant.
 
UV aging resistance: 500 hours>95% strength retention
 
 
SAMPLE
 
High Strength Concrete Blanket for Channel, Slope Protection
 
 
 
 
 
Company Profile
 
 
 
High Strength Concrete Blanket for Channel, Slope ProtectionHigh Strength Concrete Blanket for Channel, Slope Protection
Packing & Delivery
High Strength Concrete Blanket for Channel, Slope ProtectionHigh Strength Concrete Blanket for Channel, Slope ProtectionHigh Strength Concrete Blanket for Channel, Slope Protection
FAQ

High Strength Concrete Blanket for Channel, Slope Protection

Are you a manufacturer or a trading company?
Our factory has been established for over 16 years ,and has its own trading department. So we have the competitive price with best quality.

How does your factory carry out quality control?
Quality Control is one of our most important link. All of the product will be fully processed and strictly tested before packaging for shipment.

Can I get samples for checking the quality?
We can provide free samples. But you need to pay the freight. After you place the order, we will refund the single freight of the sample.

What's your MOQ?
Our MOQ is usually 1000sqm per color.

What's your delivery time?
It's about 14 days after we received the deposit.

What's your payment terms?
TT (TT 30% as deposit,and 70% balance payment at sight of BL copy)or LC at sight.

Can I visit your factory?
We always welcome you to visit our factory. Transportation is very convenient in China. You can take high-speed rail or plane, and we will pick you up in advance.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier